High accuracy As-Builts for HDD installed pipe segments is insurance for water (408 Permits), transportation, and corridor crossings. These are the highest risk segments in any system. Pipe sizes 4" to 40" are routinely mapped.
Live Gas Mapping (LGM) of in-service 2" gas lines, up to +/- 1,000' from entry point. This provides the most accurate 3D position of high-risk lines, supporting damage prevention programs.
Mapping Water & Storm systems provides critical data for performance, conflict resolution, and construction planning. Essential for any site development projects, 4" to 60" AND larger diameter.
Underground electric transmission & distribution trenchless installs (via HDD), benefit with accurate as-builts. The risk of line strikes can be catastrophic.
High speed fiber is considered critical infrastructure. Accuracy of the installed conduit is essential in any damage prevention program. Conduits from 1.25" to 4" are routinely mapped during the construction process.
In addition to high accuracy A-Builts, P4D adds an optional Video Capture to the mapping. Features are logged and classified with XYZ + ODO meta data. Another assurance layer for your project.
Copyright © 2024 Asset Mapping - All Rights Reserved.
Powered by GoDaddy